Home Up Contents

HVAC PRIME SOURCE, LLC


Maintenance Tips

 

[Under Construction]

DAMPERS & DUCTING

Maintenance

Following are some of the recommended performance monitoring and maintenance tasks for the dampers. The frequency of these tasks should be as indicated or based on operating experience -

  • External visual inspections of damper movement - semi annual
  • Internal visual inspection of the damper blade seals (mainly important for isolation function) - annual.
  • Lubrication of damper blades shaft bearings as required - as required
  • Calibration of the damper blade & actuator positioning - annual

Following are the recommended maintenance tasks for the actuators -

Pneumatic -

  • External visual inspection of the linkages and lubrication as required
  • Periodic replacement of the diaphram or piston seals
  • Periodic replacement of the solenoid valves

Electric motor -

  • External visual inspection of the linkages and lubrication as required
  • Lubrication of the reduction gears and mechanisms

Electro Hydraulic -

  • External visual inspection of the linkages and lubrication as required
  • Change hydraulic oil and filter
  • Calibration of internal controls
  • Periodic overhaul and replacement of internal components - piston and shaft seals, pump and motor, solenoid valves, etc.

 

 

 

 

Home ] Up ]

Send mail to admin@hvacprimesource.com with questions or comments about this web site.
Last modified:12/15/2008